Notices · Schedules of condition · Awards

Party wall surveyors for London and the South East

Planning a loft, an extension or a basement next to a neighbour? Or has a party wall notice just come through your door? We serve the notices, record next door's condition and agree the award, across London and the South East.

  • Fixed fees, from £70 for a notice
  • One surveyor from the first call to the signed award
  • Local: Croydon, every South London borough, Surrey and Kent
Party walls Shared stack Footings in London Clay
ElevationTypical South London terraceNot to scale

Start here

Which side of the wall are you on?

The Party Wall etc. Act 1996 gives each neighbour a different job. Pick yours and we will take it from there.

Building owner

You are planning the work

If your project cuts into a shared wall, puts a new wall on the boundary or digs close to next door's foundations, your neighbours must get written notice before it starts.

  • We check the Land Registry so every owner gets a notice, leaseholders included
  • We prepare and serve the notices, then chase the replies
  • We agree the award so your builder can start on the planned date
Help for building owners

Adjoining owner

Next door has served you a notice

You have 14 days to reply in writing. If you say nothing, the Act treats it as a dispute and surveyors get appointed anyway, so it pays to answer properly.

  • We go through the notice and drawings with you on a free first call
  • Your neighbour normally pays for the surveyor who protects your home
  • We record the condition of your property before any work starts
Help for neighbours

Local knowledge

Built around South London houses

Most party wall work south of the river happens in a handful of house types, and each one has its own habits at the shared wall. Knowing them is how we write awards that work on site as well as on paper.

See the areas we cover

A Victorian terraced house with a white bay window, with scaffolding on the house next door
A Victorian terrace in Wimbledon, with work under way next door.
Victorian and Edwardian terraces
Selhurst, Thornton Heath, Brixton, Peckham and Tooting. Rear dormers bear on the party wall, and side-return extensions build right up to the boundary.
1930s semis
Shirley, Sanderstead, Morden, Bexleyheath and Petts Wood. A hip-to-gable loft raises and extends the shared gable wall.
Houses split into flats
Streatham, Brockley, Crystal Palace and Norbury. The floor between two flats is a party structure too, so the Act can apply upstairs as well as next door.
London Clay
Much of South London sits on clay that shrinks in dry summers and swells in wet winters. Hairline cracks are common before anyone picks up a tool, so we measure and photograph them first.

Fees

Fixed fees, published here

You get the fee in writing before we start. No VAT to add.

Party wall notice

£70

fixed fee

Ownership checked, notice prepared, served and followed up.

Schedule of condition

£350

fixed fee

A measured, photographed record of the neighbouring property.

Party wall award

from £600

agreed surveyor, depending on the work

Drawings checked, award drawn up and served on both owners.

What each fee covers

The process

How a party wall matter runs

The Act sets the order and most of the deadlines. This is the usual run of events.

  1. Day 1

    Notice served

    One month ahead for a boundary wall or excavation, two months for work to a party wall.

  2. Days 1 to 14

    Neighbour replies

    Consent in writing, or dissent and appoint a surveyor. Silence counts as dissent.

  3. 10 more days

    Surveyors appointed

    A neighbour who will not appoint gets a 10-day request, then one is appointed for them.

  4. Before work

    Condition recorded

    The neighbouring property is measured and photographed.

  5. Award served

    Award agreed

    It sets out how the work is done, access, protection and costs. 14 days to appeal.

  6. 1 or 2 months on

    Work starts

    Once the notice period has run, with the award in place.

A new red steel beam resting on an old brick party wall inside a loft conversion, with new timber rafters above
A new steel beam bearing on the party wall in a Bromley loft conversion. Exactly the kind of detail the award has to get right.

Your surveyor

One surveyor, start to finish

The Act appoints surveyors as individuals, so you should know exactly who is acting for you. It is the same person on the phone, on site and signing the award.

Your surveyor has spent a lifetime in construction, first as a registered house builder and now as a party wall surveyor. That means awards written by someone who knows how lofts, extensions and basements are actually built, and what goes wrong on site.

  • Faculty of Party Wall Surveyors
  • Pyramus & Thisbe Society
  • £250,000 professional indemnity insurance
  • £1 million public liability insurance

More about us

Quick answers

Do I need a party wall surveyor for a loft conversion?

Usually, if you live in a terrace or a semi. Most loft conversions put steel beams into the shared wall or raise it, and that is work under section 2 of the Party Wall etc. Act 1996, so your neighbours need two months' written notice. If they agree in writing, no award is needed, although many people still ask for a schedule of condition. If they object or stay silent, surveyors are appointed. More on lofts and party walls.

How long does the party wall process take?

The Act sets the minimum: one month's notice for a new wall on the boundary or for digging near next door, and two months for work to a shared wall. Neighbours have 14 days to reply. When people answer promptly and the drawings are ready, the award is usually agreed inside the notice period, so the builder can start on the planned date.

My neighbour has served a notice. Do I have to pay for a surveyor?

Normally not. When the work is for your neighbour's benefit, they pay the reasonable fees of both surveyors, including the one who looks after your home. The surveyors settle the costs in the award. See who pays party wall costs.

Can my neighbour stop my extension or loft?

No. The Act does not give neighbours a veto. It gives them a say in how and when the work is done, protection for their property and a route to compensation if damage is caused. Planning permission and building regulations are separate from the party wall process.

Does the council deal with party wall disputes?

No. Croydon Council, like every other council, handles planning and building control but takes no part in party wall notices, surveyors or awards. The Act is a private process between owners.

Tell us what is planned

Send the address and a line about the work, or a photo of the notice you have received. We will tell you which notices apply and confirm the fee in writing.

Call usGet a quote